ONGOING PROJECTS

The provision of refurbishment, turnaround, and general maintanance services for water systems

CPS5 to K66 Air Release Valve Chambers

Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Sludge Canal Cleaning and side pavement repairs at workshop area
Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Full Refurbishment of Aluminium tanks A, B, C

Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Fabration and installtion for Hooper system , handrail and lifting frame for bags
Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Deep Cleaning Settler 3, All 6 x Chambers, remove all sludge/ mud including CSE works
Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Scaffolding Materials Hire and supply at Mixer 2

Client : ROO (BP)
Location : Qarmat Ali, Iraq

The provision of refurbishment, turnaround, and general maintanance services for water systems

Mixer 2 Building refurbishement to an acceptable standard.
Client : ROO (BP)
Location : Qarmat Ali, Iraq

Hydro Vac Excavation Services

Provision of industrial cleaning.
Client : ROO (BP)
Location : Rumaila Oilfield, Southern Iraq

LATEST PROJECTS

The Provision of Refurbishment Turn Around & Genral Maintenance Services

Provision of industrial cleaning, blasting, painting for piping , steel and tanks. Client : ROO (BP)
Location : Qarmat Ali Water Treatment Plant, Iraq

Provision Maintenance services piping and tanks

Supply manpower ,materials for sandblasting & painting for piping and 3 tanks from outside to inside.
Client : ROO (BP)
Location : Qarmat Ali Water Treatment Plant, Iraq

Executed comprehensive Turn Around (TARs) or Major Refurbishment of Plant (GMS).

Provision sucker trucks & equipment and provision Confined Space rescue team and associated equipment.
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Provided maintanance work resin for pipes

indsrail cleaning for above ground tank .

Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Provided maintanance work resin for pipes

instlation repairing resin applied materials ,inspaction for piping mintance .
Client : EMC /ENI
Location : Hammar DGS

Provided maintanance work resin for pipes

THE PROVISION OF REFURBISHMENT, TURNAROUND, AND GENERAL MAINTENANCE SERVICES FOR WATER SYSTEMS.
Client : ROO
Location : DS1, North Rumaila, Basra, Iraq

Provided maintanance work resin for pipes

MASTER AGREEMENT FOR THE PROVISION OF SERVICES HYDRO-VAC EXCAVATION SERVICES-CN102165.
Client : ROO
Location : DS1, North Rumaila, Basra, Iraq

Provided maintanance work resin for pipes

instlation ,inspaction for piping modafaction and painting work. Client : EMC/SHELL
Location : Almarkzia - NGL-Hammar Madhraf DGS -Zabair 1 -Hammar IBF

Provided Valve Removal/ Reinstallation Services.

remove and re-installation better fly valve 14".
Client : EMC/ENI
Location : Zubair Oil Field

Provided Valve Removal/ Reinstallation Services.

Valve Removal/ Reinstallation Multi type and size of valves.
Client : EMC/SHELL
Location : WQ1 \ Nourth Rumailla

Provided Valve Removal/ Reinstallation Services.

Piping work, scaffolding work, installation Multi type and size of valves.
Client : SAMSUNG
Location : Zubair Oil Field \New DGS

Provided Tank & Vessel Cleaning and Repair Services

Cleaning underground tank.

Client : ROO
Location : Qurinat station , Iraq

Provided Tank & Vessel Cleaning and Repair Services

internal cleaning of 4 intermediate tanks in Veolia site.
Client : ROO
Location : Qarmat Ali , Iraq

Provided Tank & Vessel Cleaning and Repair Services

Civil work,cold cutting and painting works for tanks.
Client : EMC/ROO
Location : Qurinat DGS, Markazia DGS

Provided Piping Modification and Repair Services

General Maintenance and modification works.

Client : EMC /ENI
Location : Zubair Oil Field

Provided Piping Modification and Repair Services

General Maintenance and modification works.

Client : EMC/SHELL
Location : WQ1 \ Nourth Rumailla

Provided Piping Modification and Repair Services

Piping work, Scaffolding work, Installation multi type and size of valves.
Client : SAMSUNG
Location : Zubair Oil Field \New DGS

Piping and structural steel work fabrication

Piping work, scaffolding work, installation Multi type and size of valves.
Client : SAMSUNG
Location : Zubair Oil Field \New DGS

Piping and structural steel work fabrication

Fabrication, Installation workshops.
Client : EMC
Location : EMC Zubair Camp, EMC Rumaila camp

Piping and structural steel work fabrication

Pipe Rack Modification, Piping Modification works. Client : EMC/SHELL
Location : Markazia Station,

Provided Hazardous Material Containment & Removal Services

NORM Drums Removal at DS5.
Client : ROO
Location : DS5 Station, Iraq

Provided Hazardous Material Containment & Removal Services

Norm removal at Ratqa.

Client : ROO
Location : DS5 Station, Iraq

Provided Hazardous Material Containment & Removal Services

Remove and transport NORM form Shamieh.

Client : ROO
Location : Shamieh Station, Iraq

Performed work including Confined Space Entry

nternal cleaning of 4 intermediate tanks in Veolia site, Cleaning vessel .
Client : ROO
Location : Qurinat station , Iraq

Land surveying and geometric surveys

Topographic Surveys.

Client : ROO
Location : North, South Rumaila and Qarmat Ali

Industrial cleaning

Performing high pressure water jetting and Hydro excavator for removal of deposit sludge from Water Settlers .
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Industrial cleaning

2nd lift station mud and debris cleaning and drain trench cleaning..
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Industrial cleaning

retriveing old media from filters by using Hydro excevator and industrial vacuum system.
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Industrial cleaning

Removal of spilled Sulphate , screening and transportation from Veolia within Q.A.
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq

Industrial cleaning

vacuum of prepared aluminium sulphate from preparation tank 1 and 2.
Client : ROO
Location : Qarmat Ali Water Treatment Plant, Iraq